Last updated: 15 Oct 2026 | 29 Views |
Khru Somsak is the homeroom teacher for Mathayom 1, the first year of lower secondary, at an opportunity expansion school in Phrom Buri District, Sing Buri. In Thailand, an opportunity expansion school is a rural primary school that has extended its classes up to Mathayom 3 so that village children can continue their education close to home. This one teaches everything from kindergarten to Mathayom 3, with fewer than two hundred students, most of them children of local rice farmers.
The building everyone is most attached to is the old two-story wooden classroom block. Its ground floor holds three secondary classrooms. The floor is made of wooden planks laid over timber joists, raised only a little above the ground. The walls are overlapping wooden boards, and the windows are wooden shutters that swing open to let the breeze through. Generations of students from the subdistrict have studied in these rooms.
During the 2026 floods, the school closed early. Water filled the crawl space under the building and rose about a hand span above the ground-floor planks, where it sat for several days. When the water receded, Khru Somsak and his colleagues came back to inspect the building. The classroom doors were hard to open because the wood had swollen. Some floorboards had cupped and warped. A damp, musty smell mixed with mud hit them before they even stepped inside. The wooden student desks had white mold growing on the legs and underneath the tops. The display boards of student work along the lower walls had turned to pulp, and wet mud still sat in the crawl space beneath the building.
The second semester was only a few weeks away. At the staff meeting, the director asked whether the ground-floor classrooms would be ready in time. Several teachers worried about students with allergies and asthma. One suggested simply painting over everything to get it done. Khru Somsak knew that wood still wet inside would bring the problem right back. He wanted a plan that would make this beloved building genuinely safe to use again.
Wood is porous. After several days underwater, water penetrates deep into the timber. The surface may look dry within a few days, but the inside stays damp for a long time. That hidden moisture is what keeps mold growing and what causes musty odors that simply refuse to go away.
In a wooden building raised only slightly above the ground, the crawl space has very little airflow. Mud and standing water under the floor send humidity up through the gaps between the planks all day long. Unless the crawl space is dealt with, the classroom above will stay damp.
Secondary students sit in the same classroom for six or seven hours a day. If the air carries a high load of mold spores, students with allergies or asthma may sneeze, feel congested, cough or have trouble breathing. That affects both their health and their concentration. For Mathayom 3 students preparing for end-of-year exams and the move to upper secondary or vocational school, a stuffy, musty classroom is an extra burden they do not need.
Teachers, janitors and older students who help clean the school come into contact with mud and standing water, which can carry many kinds of bacteria, including those that cause leptospirosis through cuts in the skin. Everyone should wear boots and gloves, and students should not work in a crawl space that still has standing water.
Most opportunity expansion schools have few teachers and no budget to replace an entire wooden floor or wall system at once. Doing the essential work in the right order helps the school spend wisely and still open the semester on time.
Following this order is the single most important decision a school can make after a flood. It prevents the most common and most expensive mistake, which is sealing wet wood under a fresh coat of paint and then paying to strip and repaint it a few months later.
Teachers do not need special training to keep an eye on drying progress. A few simple checks over several days give a good picture.
World Health Disinfection provides a professional disinfection fogging service using CHEMGENE HLD4H through ULV foggers, which reach the gaps between floorboards, the undersides of desks, wall corners and the crawl space. We also provide an ozone shock treatment service for classrooms that can be closed up, reducing airborne mold spores and breaking down musty odor molecules.
Timing matters as much as technique. The team schedules work for weekends or school holidays, treats the rooms that are driest first, and leaves rooms that are still damp for a second visit rather than forcing everything into one day. That way the school can open the rooms that are ready on time and bring the remaining rooms back into use a little later, without compromising on safety.
After a flood it is tempting to see an old wooden classroom block as a liability. In fact, these buildings have real strengths. Solid hardwood that has stood for decades is often sturdier than the plywood and particleboard used in many newer fittings. Wooden shutters and high ceilings give natural cross-ventilation that helps rooms dry once the crawl space is cleared. And for a rural community, the building itself carries memories: parents and grandparents of today's students sat in the same rooms.
Wood also tolerates a flood better than people expect, as long as it is allowed to dry properly. The damage usually comes later, from moisture trapped under paint, from mud left in the crawl space, or from termites drawn to damp timber. A careful recovery plan protects both the students' health and the community's investment in the building.
Mathayom students often want to help restore their school, and their energy is valuable. The key is to give them tasks that are safe and meaningful.
Handled this way, the cleanup becomes a lesson in community responsibility as well as in practical science.
Public schools report flood damage to their educational service area office and may need documentation to request repair budgets. A few simple habits make that process smoother.
A clear record also helps the next time water rises, because the school will know exactly which rooms flooded, how high and what worked.
"I am glad we did not rush to paint over everything like some people suggested. The team advised us to clear the crawl space and get air moving first, then did the disinfection and ozone room by room. When term started, the kids stopped complaining about the smell, and the students with allergies in my class could sit through lessons normally."
— Khru Somsak, Mathayom 1 homeroom teacher at an opportunity expansion school, Phrom Buri (illustrative scenario)
Beyond the wooden building, an opportunity expansion school has other spaces students use every day, and they also need to be ready before term begins.
Before term starts, the school should update parents through each class's LINE group, explaining what has been done with before and after photos, and asking parents to tell teachers about any student with allergies or a chronic condition so teachers can keep an eye on them during the first weeks.
These habits also double as a practical lesson for students about how buildings, moisture and health are connected, something many of them will need when they help repair their own homes after future floods.
Q: The wooden floor is still damp. Can it be disinfected right away?
A: Clear the mud and ventilate first so the wood surface starts to dry. The team will assess readiness during the survey.
Q: Does ozone treatment dry the wood?
A: No. Ozone helps with odor and airborne spores. Drying wood depends on ventilation and time.
Q: Do moldy wooden desks have to be thrown away?
A: Solid wood desks that are not rotten can usually be cleaned, dried and disinfected. Plywood desks that have swollen or delaminated should be replaced.
Q: Can the team work in the science room with its chemicals?
A: The responsible teacher should first check and store chemicals safely. The team then works in the agreed areas.
Q: Can the whole school be done in one day?
A: It depends on the number of rooms and how ready each area is. The team may work zone by zone so rooms that are ready can be used first.
Q: What about termites after the flood?
A: Damp timber can attract termites. Ask a carpenter or pest control specialist to inspect joists and wall bases, and treat termites separately if found.
Q: How long after ozone treatment can students return?
A: Once the team has ventilated the room and confirmed it is safe. Because treatment is scheduled on days without students, rooms normally have a full extra day of fresh air before classes resume.
Q: Should we treat the second floor too?
A: If water did not reach it, the upper floor usually needs only good ventilation and routine cleaning. However, humidity rising from below can carry musty odors upstairs, so the team will check it during the survey and advise.
Q: Which areas do you serve?
A: Phrom Buri, Mueang Sing Buri, In Buri, Bang Rachan, Tha Chang and nearby districts.
Services for schools, learning centers and wooden buildings in Sing Buri Province
View Disinfection Service – Click Here
Book Ozone Treatment – Click Here
Call 065-556-6294 · LINE @whd268 · Email worldhealthdisinfection@gmail.com
#SchoolDisinfection #PostFloodDisinfection #OzoneTreatment #MoldRemoval #MustyOdorRemoval #Chemgene #DisinfectionService #PhromBuri
Keywords: wooden classroom disinfection after flood, school ozone treatment, opportunity expansion school, wooden school building, moldy school desks, musty odor removal, Phrom Buri, Sing Buri 2026