International School Opens an 18-Classroom Building: 26 Families Ask for TVOC Test Results 12 Days Before Term

Last updated: 15 Sep 2026  |  13 Views  | 

กระบวนการอบโอโซน

Ozone Paint Odour Removal and Chemical Residue Treatment by World Health Disinfection

International School Opens an 18-Classroom Building: 26 Families Ask for TVOC Test Results 12 Days Before Term, Because of Paint and Epoxy Lab Floors

When TVOC testing for a new school building becomes the condition parents set before their children walk in, the fastest answer that also produces numbers is professional ozone paint odour treatment.

See the ozone paint odour service

Twelve days to term, and a building nobody would vouch for

This story is a composite based on situations we commonly see; names and places are fictional.

A new academic building is a school's proudest moment. But if it still smells of paint on the first day of term, that pride turns into a parent question overnight, and the first question is usually whether the school has any TVOC testing for the new school building to show.

Orapan, known to staff and parents as Khun Orn, is 44 and heads facilities and safety at Riverlake International School, a mid-sized school on the outskirts of Bangkok with about 620 students from 17 nationalities.

This year the school finished a four-storey academic building with 18 classrooms, three science laboratories and a library, timed to open with the August term.

All the finishing work landed in the final three weeks. Walls took two coats of acrylic paint. The labs got poured epoxy floors and bench tops sealed with lacquer. The library was carpeted with adhesive, classrooms received glued vinyl flooring, and more than 400 pieces of MDF furniture arrived in a single week. The steel stair railings were sprayed with anti-rust paint last of all.

On the Saturday evening twelve days before term, the school held an open house and about 140 families came to walk through the new building. Khun Orn had run every air conditioner all day and placed reed diffusers along the corridors. When the doors opened, the first thing everyone met was a sharp, sweetish solvent smell, strongest on the third floor where the labs are. Parents lifted hands to their noses, a primary student told her mother her eyes stung, and a mother five months pregnant stepped back outside after less than ten minutes.

That night the parent group filled with close to a hundred messages. Someone posted a clip of the third-floor corridor with the caption "would you sit your child in here for seven hours a day?" Another parent asked directly whether the school had any TVOC readings for the building.

On Monday morning the parent committee submitted a formal letter asking the school to produce indoor air quality results before the first day of term. Within three days, 26 families had written in to say their children would not enter the new building, including five children with a history of asthma.

The contractor insisted the smell would fade on its own in a couple of weeks. The calendar disagreed. Timetables were locked, overseas teachers had all returned, and the school had nowhere near enough backup rooms for 18 classes. Khun Orn worked out that renting temporary premises with shuttle buses would cost more than 380,000 baht a week.

What worried her most was not the number. It was a sentence a parent said in the meeting: "We are not asking the school to tell us there is no smell. We are asking for a measurement." And on that day, the school had no measurement to give.

Why paint smell in a new school building is bigger than it looks

When chemical odour lingers in a building hundreds of children use every day, the damage spreads well past comfort, into health, budget, reputation and trust.

1. Health: children are more sensitive than adults

Vapours from paint, adhesives and new fit-out materials can irritate the body even at levels many adults dismiss as "just a bit of a smell". Common complaints include:

  • Stinging, watering eyes and irritation of the nose and throat
  • Headache and dizziness, grogginess and poor concentration in class
  • Nausea and fatigue, a sense of not getting a full breath in a closed room
  • Asthma or allergy flare-ups in children with existing conditions
  • Young children, elderly staff, pregnant women and people with chronic illness are typically more sensitive than the general population

Children breathe faster relative to their body weight and spend many hours a day in the same room, so their exposure adds up more quickly.

2. Money: every unusable day has a price

  • Temporary teaching space and shuttle transport that nobody budgeted for
  • Lost revenue when new families delay enrolment
  • Overtime for staff rebuilding timetables at short notice
  • Money spent on air fresheners, charcoal and consumer purifiers that never touch the cause

3. Reputation: news travels fast in parent groups

International schools compete on confidence above all. A single short clip forwarded through parent chats can become a question at the next admissions open day, and explanations that arrive later rarely reach everyone who saw the clip first.

4. Trust: "it is fine now" stops working

When parents can still smell it for themselves, verbal reassurance only erodes confidence further. What turns the situation around is evidence people can hold: readings taken before and after the fix, with a clear account of what was done.

What that smell actually is, and why TVOC testing in a new school building matters

What the parents walked into was not "the smell of new". It is volatile organic compounds, or VOCs, evaporating slowly out of construction and fit-out materials. The process is called off-gassing, and it can continue for weeks or months. Measured together in the air, they are reported as TVOC (Total Volatile Organic Compounds).

Epoxy lab floors: tough, chemical-resistant, strong-smelling at first

An epoxy floor is resin mixed with a hardener and cured into one continuous layer. During and after curing, solvents and additives evaporate, so the characteristic sweet, sharp smell remains even after the floor is dry enough to walk on. In a sealed laboratory, it simply accumulates.

Lacquer and thinner on lab benches

Bench tops and storage cabinets finished with lacquer rely on thinner as a solvent, which smells sharper and fades more slowly than water-based products. Coat a room several times and lock the door straight afterwards, and the vapour has nowhere to go.

Wall paint and anti-rust spray

Water-based acrylic paint releases less than oil-based paint, but additives keep evaporating after the surface feels dry. The anti-rust coating on steel railings is usually a solvent-based product with a much stronger smell, and because it was sprayed in a poorly ventilated stairwell, the odour drifted up and settled on the higher floors.

Floor adhesive, carpet glue and MDF furniture

Solvent-based adhesives under vinyl and carpet give off a rubbery, oily smell, and once covered they release it slowly for a long time. MDF furniture is bonded with resins, some of which emit formaldehyde and other vapours. Move several hundred pieces in at once and the total load climbs.

Why it is worst first thing in the morning

Overnight the building is sealed, so vapours build up to their highest concentration by dawn. Most air conditioning also recirculates the same air rather than bringing in fresh air, so the compounds keep going round instead of leaving.

Five fixes schools try first, and why they miss the deadline

Khun Orn tried nearly all of them inside a week. Each has a clear limit.

  1. Leaving windows, doors and fans open. It genuinely helps, but slowly, often over days or weeks. Modern school buildings are largely sealed and air-conditioned with few opening windows, and every day of waiting pushes the timetable back.
  2. Diffusers, sprays and scent in the air handling. These mask the smell only. The source vapours are all still there, and the added fragrance can make sensitive children feel worse.
  3. Charcoal, baking soda and coffee grounds. Their capacity is tiny against the air volume of a four-storey building, and they saturate within days.
  4. Domestic air purifiers. They are sized for small rooms, their carbon filters saturate quickly, and they only treat air that passes through the unit, not the vapour held in carpet, vinyl or timber.
  5. A full deep clean. Excellent for construction dust, but odour absorbed into carpet, foam, plasterboard and wood is released again afterwards, and some cleaning products add a chemical smell of their own.

These methods are fine when time is plentiful. They do not suit a school with twelve days left, and none of them produces a number you can show parents.

The solution: ozone paint odour treatment and TVOC testing with the Master Ozone Generator

World Health Disinfection (WHD) provides ozone paint odour removal and chemical residue treatment using the Master Ozone Generator, covering acrylic and oil-based paint, thinner, lacquer, epoxy, PU, industrial adhesives, new-build and renovation odour, and musty smells or mould in enclosed spaces.

How ozone breaks odour down

Ozone (O₃) is oxygen with three atoms, and in nature it helps purify the air. The Master Ozone Generator mimics that process by releasing ozone into a sealed space. As a powerful oxidiser, it breaks the molecular bonds of odour compounds, chemical vapours (VOCs) and germs at the source. That destroys the odour rather than covering it.

When the cycle is done, the ozone decomposes naturally back into oxygen (O₂), leaving no chemical residue on desks, books or lab equipment. Because it is a gas, it reaches above ceilings, into carpet pile, under benches and up stairwells, covering large areas quickly. After the process, the area is typically ready to use within about two hours.

The source has to be finished first

If painting, lacquering or glue-down flooring is still in progress, the contractor has to close that work out first. Ozone treatment deals with odour and vapour that have already accumulated; fresh coats applied afterwards simply create new emissions. That is why treatment is scheduled once the fit-out is signed off and while the building is empty, typically over a weekend.

Results you can measure

What sets WHD apart is measuring TVOC before and after treatment at the actual site with an AM1310 meter backed by calibration paperwork (a KIMO PT100 SC0110 adjusting certificate and a BR-SMART certificate of calibration). WHD is one of the few providers in Thailand that shows TVOC reduction measured on real jobs, which gives a school something straightforward to share with parents.

Safety comes first, every time

Treatment is carried out by trained technicians in a closed space with no people, pets or plants inside during the cycle. Technicians remove or cover sensitive items such as student artwork, natural rubber goods and certain electronics, and once the cycle ends the ozone is left to decompose and the area ventilated before anyone returns.

10 reasons schools choose ozone treatment with WHD before opening a new building

1. It destroys odour at the source

Ozone oxidises the odour molecules themselves, unlike fragrance, which only hides them for a while.

2. Before and after TVOC figures for parents

You are not relying on impressions, because WHD's chemical residue removal service measures on site both before and after. Schools attach those readings to parent letters and board reports.

3. Fast enough for an opening date

Areas are typically usable about two hours after the process finishes, so a weekend booking means classrooms are back in service on Monday.

4. No chemical residue on children's things

Ozone reverts naturally to oxygen, so nothing is left coating desks, books or laboratory equipment.

5. It reaches where cloths cannot

Carpet pile in the library, the space under lab benches and the stairwell are exactly where odour collects, and a gas gets into all of them.

6. Whole buildings, not single rooms

Classrooms, laboratories, library and corridors can all be planned in one visit, with cycles sized to the volume of each space.

7. Several odour sources at once

Paint, epoxy, lacquer, floor adhesive and new furniture usually arrive together in a new building, and ozone paint odour treatment handles them in the same cycle.

8. Musty smells and germs reduced too

Buildings closed up through construction often smell stale, and ozone helps reduce germs and mould in enclosed spaces at the same time.

9. A documented, safe procedure

Technicians survey the site, seal it off, post warning signage, cover sensitive items and check the space before handover, which suits schools that must report to a safety committee.

10. Experience across very different jobs

WHD has worked in condominium bedrooms, living rooms, car spray booths, office meeting rooms and chemical plants. See the ozone paint odour service page for details.

Before and after: the new building at Riverlake

BeforeAfter
A sharp solvent smell hit you at the door each morning, strongest on the lab floorMarkedly reduced, with only a faint new-material smell left in corners of the labs
26 families said their children would not enter the new buildingMost returned once they saw the readings and walked the building again
The school had no figures, only the phrase "it will fade"Before and after TVOC readings from the site, with meter calibration paperwork
A contingency plan for temporary premises at over 380,000 baht a weekThe school's own building opened on the original date, with nothing rented
Teachers propped classroom doors open and avoided using the labsLaboratories back on the timetable as planned

How the WHD team works

  1. Site survey and TVOC reading before treatment. Volume of each floor is assessed, hot spots identified and baseline figures recorded.
  2. Confirmation that paint and adhesive work is finished, so no new source appears after the cycle.
  3. People, pets and plants out, with sensitive items such as student artwork removed or covered.
  4. Area sealed and the Master Ozone Generator set up where ozone will distribute evenly, with warning signage at the entrances.
  5. Cycle run to a time calculated from room volume, with classrooms, laboratories and the library treated on separate cycles.
  6. Ozone left to decompose and the area ventilated before anyone is allowed back in.
  7. TVOC and odour re-checked, then handover with guidance. Spaces are generally ready to use about two hours after the process ends.

How the story ended: a building that opened on schedule

On the Tuesday evening Khun Orn messaged the WHD team on LINE. They surveyed on Thursday and took TVOC readings floor by floor, finding that the three laboratories and the freshly sprayed stairwell read clearly higher than the ordinary classrooms.

Before treatment, the contractor had to finish the last round of lacquer work by Friday so no new source would appear. Over Saturday and Sunday the technicians worked zone by zone with the Master Ozone Generator, from the third-floor laboratories to the library, every classroom, the corridors and the stairwell.

After the ozone was left to decompose and the building ventilated, the team re-measured at the same points. Readings were clearly lower everywhere, and the sharp smell that used to meet you at the door had faded to a light new-material trace in a few lab corners. The team advised running fresh-air ventilation daily until term began.

The following Monday the school wrote to parents, attaching the before and after readings with the method, dates and measurement points, then invited some 40 families back for another walk-through. Several said the difference from the first visit was obvious.

Term began on the original date. Of the 26 families who had written in, 23 sent their children into the new building on day one, and the remaining three joined a week later. What Khun Orn got back was not just a timetable that could run, but trust rebuilt on something measurable.

Advice for schools planning a build or refurbishment

  • Write low-VOC materials into the contract for wall paint, epoxy systems, floor adhesives and furniture with documented low emissions.
  • Allow curing and airing time between handover and the first day of term, and avoid cramming paintwork into the final week.
  • Sequence the trades. Paint and flooring should finish before furniture arrives, not alongside it.
  • Check that fresh-air supply and lab fume cupboards actually work before opening day, rather than just recirculating.
  • Build ozone treatment and TVOC testing into the handover plan, and tell parents in advance rather than waiting to be asked.

FAQ: ozone treatment and TVOC testing in a new school building

Does everyone have to leave during treatment?

Yes. People, pets and plants must all be out of the area for the whole cycle. Technicians seal the space, post warning signage and state clearly when it can be reoccupied.

How long does it take?

It depends on the size of the space and how strong the odour is. Multi-storey school buildings are usually treated zone by zone over a weekend, and areas are generally ready to use about two hours after the process ends.

Does ozone leave anything behind? Is it safe around children?

Ozone decomposes naturally back into oxygen, so no chemical residue is left on surfaces or belongings. Treatment is only ever carried out in a closed, unoccupied space, and the team waits for the ozone to decompose and ventilates before handing the area back.

What size of space is it suitable for?

Everything from a condominium bedroom or meeting room up to multi-storey school buildings, warehouses and factories, with cycles sized to each volume.

Can we show the TVOC results to parents?

Yes. WHD measures on site before and after with a meter that has calibration documentation, so schools can share the results openly.

Will the smell be gone completely?

Ozone significantly reduces and breaks down these vapours, which the before and after TVOC readings confirm, but new materials can keep off-gassing for a while, so continued fresh-air ventilation is still recommended.

Open your building with answers, not apologies

Talk to the WHD team about paint, epoxy and adhesive odour, and about TVOC testing for a new school building before handover.

See the service and get a quote, click here

Tel 065-556-6294 · LINE @whd268 · Email worldhealthdisinfection@gmail.com
88/268 Kanlapaphruek Road, Bang Khae, Bangkok 10160

Keywords: TVOC testing new school building, ozone paint odour removal, paint smell in schools, epoxy floor odour, new building smell, chemical residue removal, TVOC reduction, indoor air quality in classrooms, school handover air testing, Master Ozone Generator

Powered by MakeWebEasy.com