Last updated: 2 Sep 2026 | 26 Views |
A twelfth-floor office in Sathorn recorded abnormally high sick leave for two consecutive quarters. When HR investigated properly, the answer was not seasonal flu.
Jira is the HR manager of a consulting firm, responsible for 68 employees on the twelfth floor of an office building in Sathorn. She compiles the monthly leave statistics, which made her the first person to notice something was wrong.
In the first quarter, average sick leave was 1.2 days per employee, entirely normal. In the second quarter it reached 2.8 days. In the third quarter it hit 3.4. What stood out was that the reported symptoms were not influenza but a strangely repetitive cluster.
What convinced Jira this was not coincidence came during a two-week work-from-home period while the electrical system was upgraded. Sick leave dropped to almost zero, then climbed straight back the moment everyone returned to the office.
She took the data to the management meeting and was approved to investigate the building environment properly.
What Jira had found has a formal name: Sick Building Syndrome, a condition where occupants experience health symptoms associated with being in a specific building, which improve on leaving it.
The common causes in Thai offices are several, and almost all involve things nobody can see.
In this environment, dust mites and allergens accumulate continuously, with no mechanism to reduce them other than deep cleaning.
Further reading on indoor air quality and occupational health is available from the World Health Organization and the Department of Disease Control.
Jira translated a health issue into the language executives act on: cost.
Cost of sick days. Sixty-eight employees taking an average of 2.2 additional sick days per quarter compared with Q1 equals nearly 150 lost working days in a single quarter.
Cost of reduced output. People who come in while symptomatic rarely perform at full capacity, a cost invisible in the accounts but very real in delivery.
Cost of delivery delays. A consultancy works in teams to fixed deadlines. When a team member disappears at short notice, the whole project slips.
Cost of attrition. Three employees resigned in six months, and one cited in the exit survey that the workplace environment was damaging their health.
Cost to employer brand. A company that says it cares about its people while its office makes them ill is a gap that younger employees notice very quickly.
Set against the price of one deep cleaning programme, the decision was made in the room.
Jira confirms the company employs two daily cleaners. So why was it insufficient?
1. Daily work targets what is visible. Bins, desks, walkways and washrooms, all necessary, none of it deep cleaning.
2. A standard office vacuum only reaches the surface. Dense commercial carpet needs far greater suction to lift contaminants from the base of the pile.
3. Bag vacuums exhaust fine dust back into the room. In a sealed office on central air conditioning, that dust spreads across the entire floor.
4. Chair upholstery is almost never scheduled. Despite being the surface in contact with employees for eight hours a day.
5. Meeting rooms are booked constantly. With no free window for deep cleaning, many companies keep postponing until it never happens at all.
The firm engaged the dust mite removal, carpet and upholstery cleaning service with full disinfection from World Health Disinfection, scheduled for a Saturday so operations were unaffected.
The team used the SIRENA System dust mite vacuum, combining water filtration with HEPA filtration down to 0.02 microns. The critical point for a sealed office is that all dust is captured in water rather than pushed back into the central air conditioning.
Scope covered the wall-to-wall carpet across the entire floor, 68 task chairs, chairs and fabric wall panels in three meeting rooms, the reception sofas, and every curtain, finishing with medical-grade disinfection throughout.
Jira says what silenced the management team was the photograph of the tank after the central office carpet was cleaned. The water had turned grey-black with thick sediment, from carpet that had been vacuumed daily for six years.
Before the service
| One quarter after the service
|
The team proposed a cycle matched to how an office is actually used.
A cycle like this makes budgeting predictable and lets management tie a clear indicator, sick leave rate, to the investment.
“I brought the sick leave data to the meeting and nobody believed it had anything to do with the carpet. Then the team sent through the photo of the tank after cleaning the central office carpet, and the room went silent. The following quarter sick leave dropped by more than half. It is the best value project HR has ever proposed here.”
— Jira, HR Manager, consulting firm, Sathorn, Bangkok
Organisations wanting comprehensive coverage can combine this with the disinfection spraying service to address allergens and pathogens in a single programme.
Let the World Health Disinfection team survey and deep clean your carpets, task chairs, meeting rooms and curtains, with disinfection included. Free site assessment.
See the Dust Mite Removal Service and Pricing: Click Here
Free consultation and booking. Call 065-556-6294 or add LINE @whd268
For most HR and facilities teams the problem is not knowing what to do. It is showing leadership why the budget is justified. Jira set out the approach that worked in her meeting.
Step one: pull at least four quarters of sick leave data, then split it into leave with and without a medical certificate. A rise in the group without certificates usually reflects low-grade chronic symptoms linked to the environment.
Step two: find a natural comparison period, such as a work-from-home stretch, a long holiday, or a temporary relocation to another floor. If sick leave drops in those windows, you have a strong piece of evidence.
Step three: run a five-question survey. Ask only where symptoms occur, at what time, and when they improve. Short surveys get much higher response rates and produce sharper data.
Step four: convert it to money. Multiply lost working days by the average daily cost of an employee, then set that against the cost of one deep cleaning programme. That number usually argues the case for you.
Step five: propose it as a pilot. Ask for one floor or one zone first and measure against an untreated zone. This lowers the perceived risk and is approved far more readily than a whole-building request.
Step six: capture before and after photographs every time, especially the tank water after carpet cleaning, because it communicates instantly without any technical explanation.
When technicians survey an office building, the items found to be absent from any deep cleaning plan are almost always the same set.
Including these in the scope from the start is what makes the outcome measurably different from daily cleaning, and materially improves the chance of hitting the indicator HR has set.
| Criterion | Standard vacuum | SIRENA water filtration |
|---|---|---|
| Particle containment | Dry bag or bin; fine particles escape through the exhaust | Everything sinks into water; nothing returns to the room |
| Filtration fineness | Coarse to moderate | HEPA down to 0.02 microns |
| Depth of extraction | Surface of mattresses and carpets only | 1200-watt motor pulls from deep layers and seams |
| Effect on allergy sufferers | May provoke symptoms during use | Certified by the Asthma Society of Canada |
| Verifying the result | Judged from a dust bag, which shows little | The water in the tank is visible immediately |
| Scope of use | Mainly floors and carpets | Mattresses, pillows, sofas, carpets, curtains and plush toys |
In an office building on central air conditioning, particles exhausted by a vacuum in one zone can travel across the entire floor within a short time.
#OfficeCarpetCleaning#SickBuildingSyndrome#DustMiteRemovalService#WorkplaceWellbeing#ReduceSickLeave#SirenaDustMiteVacuum
Related searches: office carpet cleaning, sick building syndrome, dust mite removal service, workplace wellbeing, reduce sick leave, task chair cleaning, office disinfection Bangkok, indoor air quality at work
Jira recommends that HR define the metrics before the project starts, because data reconstructed after the fact is usually incomplete and unconvincing.
Primary metric: sick days per employee per quarter. Split it into leave with and without a medical certificate, which makes the low-grade chronic symptoms typically linked to the environment far more visible.
Secondary metric: days worked while symptomatic. Captured through a short monthly survey, this reflects a cost the accounting system never sees.
Qualitative metric: workplace environment satisfaction score. Use identical wording each time so results are comparable, and ask separately about air, odour and cleanliness.
Supporting metric: air purifier filter life. If filters soil more slowly after the clean, that is indirect evidence that airborne particle levels genuinely fell.
Cost metric: carpet and furniture replacement spend. Organisations on a maintenance cycle typically extend carpet life by several years, a figure procurement takes seriously.
Jira adds that you should gather at least one quarter of data before the project and two quarters afterwards, because the effect of reducing allergens in a building usually becomes clear in the following quarter rather than the first week. Reporting too early can see a genuinely effective programme lose its budget for no good reason.
One further point from her experience: name a single owner for the data. In her company the project nearly stalled because three departments each held part of the picture and nobody was responsible for assembling it. Once she took ownership of the whole dataset, the reporting became straightforward and the renewal decision took a single meeting.
For organisations, quotations can be broken down by zone or by floor so that procurement can compare options and approve the work in phases.
The standard scope of the World Health Disinfection full dust mite removal service covers the following.
Service areas. All of Bangkok and the surrounding metropolitan area, including Nonthaburi, Pathum Thani, Samut Prakan, Nakhon Pathom and Samut Sakhon. Provincial locations are served by arrangement, particularly for multi-site or multi-building work carried out in one programme.
Booking and quotation. Quotations are free by phone or LINE, with no cost and no obligation. Simply describe the area, the number of rooms, the number of mattresses and the fabric items you want treated, and the team will set out the scope and expected duration before you decide.
One thing Jira did not anticipate was how much the internal communication mattered. Her first draft announcement, which explained that the office environment had been linked to elevated sick leave, worried people considerably more than she intended.
Lead with the action, not the diagnosis. Her revised message opened with what the company was doing and when, and mentioned the reasoning briefly afterwards. People respond very differently to a problem that is already being solved.
Be specific about what will be treated. Vagueness invites speculation. Listing carpets, task chairs, meeting rooms and curtains gave employees something concrete and stopped rumours about mould in the walls, which was never the finding.
Say clearly what employees do not need to do. No need to clear desks entirely, no need to take equipment home, no disruption to the working day. Uncertainty about personal impact generates more anxiety than the underlying issue.
Name a contact for questions. A single named person, rather than a shared inbox. Jira received eleven questions in total, which she says was far fewer than the number of conversations that would have happened in corridors without an outlet.
Report the outcome afterwards. This is the step most companies skip. Sharing the following quarter sick leave figures closed the loop and, in her case, made the renewal request straightforward because employees had already seen the result.
She notes one detail she would repeat: she asked the team to share the tank photographs internally rather than only in the management report. Employees found them memorable, and several started asking about their own homes, which she regards as a genuinely good outcome from a workplace programme.